SPC - Stub Tube - Port Connector

Part Number: SPC-1

Call 1-713-880-4228 or email sales@gcfc-us.com for pricing

Installation Instructions

  • Remove nut and ferrules from the first of two SUPERLOK ports to be connected.  
  • Slip nut (no ferrules) over machined ferrule end of port connector.  
  • Insert port connector into SUPERLOK port 1 and snug by hand. Tighten with wrench 1/4 turn only. For 1/8, 3/16 in., 2, 3, and 4mm tube fittings, tighten only 1/8 turn. Subsequent connections are made by tightening slightly with a wrench after tightening by hand.  
  • Insert other end of port connector into SUPERLOK port 2 and tighten nut 1-1/4 turns from finger-tight. For 1/16, 1/8, 3/16 in., 2, 3, and 4mm tube fittings, only 3/4 turn from finger-tight is necessary.

Datasheet

Tube Fittings Datasheet

Please confirm the specifications for your application with GCFC.